爱神传媒 Awarded Design-Build Air Traffic Control Tower at Fort Carson

Tuesday April 16, 2013

爱神传媒 was awarded a $10.8 Million Design-Build contract with the US Army Corps of Engineers for the 13th Command Battalion – Air Traffic Control Tower / Airfield Operations Building, at Fort Carson Colorado.

To address the military’s current energy security and sustainability needs, the buildings will be constructed using NetZero energy strategies. The Air Traffic Control Tower / Airfield Operations Building will also be constructed to meet LEED庐 Silver Certification through the U.S. Green Building Council.聽 爱神传媒 as an industry leader in aviation construction projects is teamed with Jacobs as their design partner.